Resistant High Pressure Hose

HomeProducts Center

Resistant High Pressure Hose

Resistant High Pressure Hose

Other Names:

Mainly used for mine hydraulic support, oilfield development, suitable for engineering construction, lifting, transportation, metallurgy forging press, mining equipment, vessels, injection molding machinery, agricultural machinery, all kinds of machine to

Related Products

Product Detail:

Product Introduction

Product Detail

Resistant High Pressure Hose Introduction

Mainly used for mine hydraulic support, oilfield development, suitable for engineering construction, 

lifting, transportation, metallurgy forging press, mining equipment, vessels, injection molding machinery, 

agricultural machinery, all kinds of machine tools and various industrial departments mechanization, 

automation has certain pressure in hydraulic system (high pressure) and temperature of oil (such as mineral oils, 

soluble oil, hydraulic oil, fuel oil, lubricating oil) and water-based liquids (such as emulsion, oil-water emulsion, water) and hydraulic transmission, the highest working pressure resistant up to 70-120 mpa.

High pressure rubber hose is mainly by the hose consists of inner layer protectionlayer, 

middle or four or six layers wire spiral layer and external rubber cover.

High pressure hose mainly in temperature: - work under 40 ℃ to + 100 ℃, 

so you must grasp the temperature, do not use undeserved, to bring you unnecessary consequences.

Resistant High Pressure Hose Cleaning Method & Steps

1According to the location of the application of drill stand erect position.

2Cleaning machine is composed of motor, reducer, electric control box, 

temperature control system, guide rail, etc.

3Electricity no-load running five minutes before drilling, when drilling rig is normal, 

and the spindle rotation direction with the direction arrow on reducer, power off, drill pipe, 

low frequency heater. Transmission reducer drive drill rig.

4Electrical control power supply system, drilling machine and heating system by control box.

5Power supply device, through the pipe into the hole bottom, heated oil pipeline. 

After dissolving oil outflow.

6Choose the piston will melt the crude oil.

7When the drill to the required depth, stop going forward, the host exits if necessary, 

using external heating system pipe outside the cleanup.


Product Feedback

Average Star Rating:

History Feedback: (0)

Latest Feedback

    Star Rating:
    Contacts: *
    EMail: *
    Message: *
    Verification code:          
     
     
    客服中心

    客户服务热线

    0537-7768777


    展开客服