High voltage cable connector product introduction

HomeProducts Center

High voltage cable connector product introduction

High voltage cable connector product introduction

Other Names:

Mining explosion-proof cable connector is used in the excavation roadway of mine to link 1140 V -10kV power cable circuit and for wiring of cables with UGSP monitoring and shielding for power supply in the mobile substation. It can connect the both ends o

Related Products

Product Detail:

Product Introduction

 

Product Detail

High voltage cable connector product introduction

Mining explosion-proof cable connector is used in the excavation roadway of mine to link 1140 V -10kV power cable circuit and for wiring of cables with UGSP monitoring and shielding for power supply in the mobile substation. It can connect the both ends of the cable segment for the purpose of mutual cut-in ,or its half explosion-proof part can be connected to the mobile substation.

High voltage cable connector features

1the connector is composed of two actually same parts with the public usage conducting rod and every part includes cable entrance system, wiring holder and insulator;
2
the clamp that used to prevent cable pulling out is designed casting with bow gouge , this improve the reliability of fastening line;
3
insulator is made of by the good quality insulation material (DMC);
4
the connection between the insulator and the case adopts inner fixation to avoid the connection with outside.

High voltage cable connector maintenance

1use and maintenance process, should prevent flame-proof collision or rust.

2connectors are strictly prohibited in the process of maintenance of charged operation, must ensure that no residual voltage after power off when Fang Keba on or remove any part, residual charge except in accordance with the rules of coal security with reliable means of discharge, can also use mobile power station attenuation discharge The operating sequence is as follows:

2.1general load switch to keep closing before operation, opening and "switch off" sign or high voltage switch to lock, and then operated the connector, if you have the low voltage feedback may be should be open feeding switch and load switch.

2.2 if the high voltage switch load switch has broken, in the open before the high voltage switch to sign or after locking, load switch is closed for at least one minute, first (via Shanghai machine tests showed that the general can be set within a second safety voltage) make drain the residual voltage in order to ensure safety, and the necessary operation.

2.3replace the plug must finish line after the line transmission.

2.4the flange of the middle connector shell will unplug after a period of time as required in the application letter lid is good, still use sealing gasket sealing, to prevent moisture intrusion.

Product Feedback

Average Star Rating:

History Feedback: (0)

Latest Feedback

    Star Rating:
    Contacts: *
    EMail: *
    Message: *
    Verification code:          
     
     
    客服中心

    客户服务热线

    0537-7768777


    展开客服